Metocean for offshore operations

Platforms, pipelines, floating units, decommissioning: every phase depends on a sea state. Analyzenn provides the operating windows your teams need, with a method you can challenge.

Operations and structures covered

For each one, the question asked of the data and the answer delivered.

Jacket and topside installation

Transport and installation windows, weather downtime statistics for costing.

Persistence · execution forecasts

Weather forecasting

Heavy lifts

The probability of staying within your wave height, period and wind limits for the whole lift.

Site exposure to lightning: storm density map.

Multi-model go / no-go

Weather forecasting

Towing and transit

Conditions along the route and departure criteria, season by season.

Route climate · windows

Metocean analysis

Pipeline and umbilical lay

Operability by wave direction and period, to plan the campaign.

Hs / Tp / direction diagrams

Metocean analysis

Floating units and moorings

Combined wind-wave-current extremes for mooring load cases.

Multivariate extremes

Extreme value analysis

Decommissioning

Choosing the removal season, then tracking windows during the campaign.

Statistics + forecasts

Metocean analysis

The metocean parameters of your design basis

Normal conditions for fatigue and operability, extreme conditions for survival, each with its method and uncertainty. Parameter definitions: what does metocean mean? Detailed methods: metocean site study and extreme waves and return periods.

ParameterNormal conditionsExtreme conditions
Waves (Hs, Tp, direction)Scatter diagrams, wave rosesReturn periods from 1 to 100 years
WindDistributions, seasonality, rosesReturn levels, confidence intervals
CurrentStatistics by directionAssociated extreme values
Water levelTide and variabilityExtreme levels
CombinationsWind-sea correlationsConditional wind-wave and wave-level extremes

How an assignment runs

  1. Step 1

    Scoping

    Site, operation, limits, timeline and expected format. One conversation is enough.

  2. Step 2

    Data

    Measurements, reanalyses and models cross-checked, quality-controlled and bias-corrected.

  3. Step 3

    Analysis

    A scripted, documented method with quantified uncertainty.

  4. Step 4

    Delivery and review

    Method note in English or French and tables, then a review with your engineers.

Real analyses, published and interactive

An Hs / Tp diagram off Ushant, wind return levels from 35 years of reanalysis, storm density over the Iroise Sea: the same processing chain as your deliverables.

View all analyses
Hs / Tp scatter diagram
Wind return levels

Any offshore area

Remote work, wherever global reanalyses and your measurements cover the site.

Independent

Tied to no data or sensor provider: sources are chosen for your needs.

Your standards

Your organisation's units, vocabulary and reference documents.

An operation to plan or a structure to design?

Send the site, the operation and the timeline: you get back what the data can support and the proposed method. You can also use the contact page.

Request a study