Jacket and topside installation
Transport and installation windows, weather downtime statistics for costing.
Persistence · execution forecasts
Weather forecastingPlatforms, pipelines, floating units, decommissioning: every phase depends on a sea state. Analyzenn provides the operating windows your teams need, with a method you can challenge.
For each one, the question asked of the data and the answer delivered.
Transport and installation windows, weather downtime statistics for costing.
Persistence · execution forecasts
Weather forecastingThe probability of staying within your wave height, period and wind limits for the whole lift.
Site exposure to lightning: storm density map.
Multi-model go / no-go
Weather forecastingConditions along the route and departure criteria, season by season.
Route climate · windows
Metocean analysisOperability by wave direction and period, to plan the campaign.
Hs / Tp / direction diagrams
Metocean analysisCombined wind-wave-current extremes for mooring load cases.
Multivariate extremes
Extreme value analysisChoosing the removal season, then tracking windows during the campaign.
Statistics + forecasts
Metocean analysisNormal conditions for fatigue and operability, extreme conditions for survival, each with its method and uncertainty. Parameter definitions: what does metocean mean? Detailed methods: metocean site study and extreme waves and return periods.
| Parameter | Normal conditions | Extreme conditions |
|---|---|---|
| Waves (Hs, Tp, direction) | Scatter diagrams, wave roses | Return periods from 1 to 100 years |
| Wind | Distributions, seasonality, roses | Return levels, confidence intervals |
| Current | Statistics by direction | Associated extreme values |
| Water level | Tide and variability | Extreme levels |
| Combinations | Wind-sea correlations | Conditional wind-wave and wave-level extremes |
Step 1
Site, operation, limits, timeline and expected format. One conversation is enough.
Step 2
Measurements, reanalyses and models cross-checked, quality-controlled and bias-corrected.
Step 3
A scripted, documented method with quantified uncertainty.
Step 4
Method note in English or French and tables, then a review with your engineers.
An Hs / Tp diagram off Ushant, wind return levels from 35 years of reanalysis, storm density over the Iroise Sea: the same processing chain as your deliverables.
View all analysesRemote work, wherever global reanalyses and your measurements cover the site.
Tied to no data or sensor provider: sources are chosen for your needs.
Your organisation's units, vocabulary and reference documents.
Send the site, the operation and the timeline: you get back what the data can support and the proposed method. You can also use the contact page.